New Jersey High School $800,000 Lab Renovation | Longo
The West Milford High School, located in West Milford, NJ has over 1,100 students in grades 9-12. In an effort to structure a 21st learning atmosphere, a $800,000 renovation project was launched to replace the aging chemistry and physics labs. With the progression of STEM Education, renovations to existing labs are a key factor in preparing students for their higher education goals.
Purchasing Contracts – Designed to Save Time and Money
Today purchasing is an essential activity for any non-profit organization, educational, healthcare, or government institution. Along with purchasing, comes the need to stay within a budget, without compromising quality. Most organizations and institutions are handed down a budget that can sometimes
Plainfield High School Removation | Longo
The Plainfield High School, located in Plainfield, NJ, is home to grades 9 thru 12. Plainfield High School was founded in 1857, which makes it the second-oldest high school in the state of New Jersey. With a student body of about 1,500 students, there was a need for updates to the science labs. The newly renovated biology labs, chemistry labs, physics labs, general science labs and prep rooms were all part of a $2M project which encompassed 16 rooms and included furniture provided by Longo Labs, as well as their design expertise.
Newark Academy Newly Renovated Labs | Longo
As a follow-up to our July 20th post (http://longolabs.com/nj-private-schools-11-3m-science-lab-renovation-includes-longo-labs/), Longo Labs furniture was pictured on the Newark Academy's Instagram account showing the beautiful finished product!
Sheldon Science Lab Products | Longo
The secret's out -- Longo Labs, a supplier of Sheldon science lab products, can help you build or redesign your science lab. Longo Labs will design your room, recommend furniture that fits and complements the space and do the installation.
NJ Middle School Uses Longo Labs for Science Lab Updates
The Holdrum Middle School, located in River Vale, NJ, received a charitable donation of $100,00 from the River Vale Educational Fund to do some much needed upgrades to four science labs.
Longo Labs Back at Pequannock Township Schools
The Pequannock Township High School is located in Pompton Plains, a northern suburb of New Jersey. The school has a student population of roughly 750 serving grades 9-12. The high school has a concentrated focus on providing an unparalleled education to
NJ Private School $11.3M Science Lab Renovation | Longo
The Newark Academy, a private institution, located in Livingston, NJ, was established in 1774. It consists of a middle school for grades 6-8 and an upper school for grades 9-12.
Another New Jersey Middle School Chooses Longo Labs
The Pequannock Valley School located in Pompton Plains, NJ has a population of 575 students serving grades 6-8. With a heavy emphasis on preparing the students for high school, the STEM (Science, Technology, Engineering & Math) focus is expanding. A new cutting edge science lab has been added to keep up with this effort and Longo Labs was selected to provide the new equipment. Longo Labs is a highly regarded expert in the field of science lab renovation projects. The equipment was purchased using the ESCNJ/MRESC Purchasing Contract.
New Labs Coming to Perth Amboy High School
Perth Amboy High School is located in Middlesex County in Perth Amboy, New Jersey. The current school population is about 1900 students and serves grades 9-12. Built in 1971, the existing Perth Amboy high school was in need of some multi-phased lab renovations. Currently, the high school is in the process of a six phased lab renovation project.