Longo Labs Blog

Blog

Trending topics, announcements, news, highlights and informative articles written by industry experts.

Big News

The West Milford High School, located in West Milford, NJ has over 1,100 students in grades 9-12. In an effort to structure a 21st learning atmosphere, a $800,000 renovation project was launched to replace the aging chemistry and physics labs. With the progression of STEM Education, renovations to existing labs are a key factor in preparing students for their higher education goals.

The Plainfield High School, located in Plainfield, NJ, is home to grades 9 thru 12. Plainfield High School was founded in 1857, which makes it the second-oldest high school in the state of New Jersey. With a student body of about 1,500 students, there was a need for updates to the science labs. The newly renovated biology labs, chemistry labs, physics labs, general science labs and prep rooms were all part of a $2M project which encompassed 16 rooms and included furniture provided by Longo Labs, as well as their design expertise.

The Pequannock Valley School located in Pompton Plains, NJ has a population of 575 students serving grades 6-8. With a heavy emphasis on preparing the students for high school, the STEM (Science, Technology, Engineering & Math) focus is expanding. A new cutting edge science lab has been added to keep up with this effort and Longo Labs was selected to provide the new equipment. Longo Labs is a highly regarded expert in the field of science lab renovation projects. The equipment was purchased using the ESCNJ/MRESC Purchasing Contract.