French-American School of NY (FASNY) New Lab | Longo
The French-American School of NY (FASNY), located in Mamaroneck, New York provides a program which combines both French and American International curriculum. The private school is a bi-lingual international day school with nearly 350 students ages 3 years old thru
Wood Laboratory Casework for Pequannock High School – Longo
Longo Labs was on the job again at Pequannock High School, located in Pompton Plains, NJ updating more science labs. As you may recall, Longo Labs completed some science lab renovation work back in 2016 for the high school (click here to view).
Axis Lab Table at NJ High School | Longo
The Mountain Lakes High School, located in Mountain Lakes, NJ has just opened a new Academy for Biotechnology. The science classroom space utilizes Sheldon's Axis Lab Table, oak wood laboratory casework, epoxy resin counter tops and laboratory fume hoods. What is Biotechnology? According to the online version of the Merriam-Webster dictionary, "the manipulation (as through genetic engineering) of living organisms or their components to produce useful usually commercial products (such as pest resistant crops, new bacterial strains, or novel pharmaceuticals); also: any of various applications of biological science used in such manipulation".1
Flexible High School Science Lab Now Complete in Massachusetts
As a follow-up to our September 21, 2017 post, we are happy to share with you the completed installation photos from the David Prouty High School showing the finished classroom space. Pictured below are the Sheldon Mobile Axis Infinity Lab Tables The choice
University Laboratory Space Completed
During this past summer, another university laboratory space was completed. Products used in this project included: Plastic Laminate Lab Casework, Laboratory Benches, Epoxy Resin Counter Tops Below are photos showing the installation: Click here to contact us today - we have a wealth of
Longo Renovates Science Lab Classrooms at NJ Middle School
The Eisenhower Middle School, part of the Roxbury School District, located in Succasunna, NJ is home to grades 7 and 8. With the focus at the school on their STEAM Program (Science, Technology, Engineering, Arts and Mathematics), newly updated classrooms are required to accommodate these disciplines. Not only are science lab tables needed, but increased storage for materials are essential to teach these subjects.
Massachusetts High School Renovates Science Room | Longo
The David Prouty High School, part of the Spencer-East Brookfield Regional School District located in Spencer, MA is home to students in grades 9-12. The high school is a public school offering students the option to earn college credits and/or
$37.5M Expansion Project in Bridgeport CT College | Longo
The Housatonic Community College, located in Bridgeport, CT, is a two year public college. The college was established in October of 1967 and in 1997, the college moved to its current site. In March of 2016, ground was broken on a $37.5M expansion project, adding 47,000 plus square feet to Lafayette Hall, which was the college's first building. This project will be able to take the current enrollment from 5,400 to 8,000 students.
New Science Labs & Prep Rooms for NJ High School | Longo
The Memorial High School, located in West New York, NJ, is a public high school serving grades 9-12. With a strong emphasis on preparing students for the future, six new science labs and two new prep rooms were just recently completed.
Passaic County Tech Renovation | Longo
Located in the United States, Project Lead The Way (PLTW) is a non-profit organization whose main focus is to provide K-12 STEM curriculum to public, private and charter schools. In addition, the organization also administers professional development training for teachers. These programs are designed to help assist students in preparation for a global economy.