Hurricane Ida hit in September of 2021 and the Cresskill School District was flooded with three feet of water. Longo labs was honored step in and help reopen the schools. This large-scale renovation included six high school science labs, two middle school science labs, art rooms, and even a robotics room. The updates included mobile student workstations, resin countertops, wood casework, sink and faucet fixtures. To help make the best use of space in the labs, we installed the best products to fit the needs of each space including the TEII Work Center and Axis Workstations.
CABINET COLOR: TEAK OAK
PULLS: BLACK EPOXY POWDER COAT
HINGES: BLACK EPOXY POWDER COAT